From a Princes Street garage.
To a 2,300 m² factory.

Clive and Beverly Wilson started the business in 1968 from a garage at 143 Princes Street, Invercargill, building industrial control systems. By 1969 it had moved to a workshop in Ettrick Street, and in 1971 it was formally established.

Today we work from 33 Clyde Street, Invercargill, with 2,300 m² of factory floor and 25 staff, including 3 in the drawing office and 3 apprentices. Our quality management system has been ISO 9001 certified since 1995.

The work has grown from local boards to large switchboards and motor control centres for industrial, infrastructure and commercial projects across New Zealand.

  1. 1968

    A garage on Princes Street

    Clive and Beverly Wilson start the business from a garage at 143 Princes Street, Invercargill, building industrial control systems and instrumentation. In 1971 the company is formally established and moves into a purpose-built building.

    Clive Wilson's first business card, 143 Princes Street, Invercargill
  2. 1973

    First export

    A control panel for a concrete plant in Apia, Western Samoa.

    Control panel built for a concrete plant in Apia, Western Samoa, 1973
  3. 1988

    The next generation

    After Clive’s sudden death in 1983, a tragic loss for his family and the team, his son Alan Wilson and Wayne Affleck buy the business. A year later it moves to 33 Clyde Street, still home today.

    Alan Wilson and Wayne Affleck
  4. 1995

    Simotrol and ISO 9001

    The first Simotrol switchboard, an MSB for the Millennium Hotel in Queenstown. ISO 9001 certification follows the same year and is held to this day.

    The first CWS Simotrol switchboard, an MSB for the Millennium Hotel, Queenstown, 1995
  5. 2000

    Schneider Prisma and Manapouri

    Schneider Prisma joins the range, and the team completes a 400 V refurbishment at Manapouri Power Station.

    Schneider Prisma main switchboard for a Queenstown casino, 2000
  6. 2025

    The third generation

    Alan’s son Chris and daughter Kylie are appointed directors. In 2026 the workshop builds its highest-rated board yet, a 4000 A, 100 kA Logstrup MCC. See our large switchboard capability.

See the work

Switchboard projects across New Zealand

CWS assemblies for the Frimley and Eastbourne drinking-water projects

Frimley & Eastbourne

Main switchboards, MCCs and control panels manufactured, wired and factory tested for ICE Electrical. Software programming and site commissioning were provided by the project’s integrators.

Explore the water project
Southern Charity Hospital and the CWS switchboard package

Southern Charity Hospital

A Form 4 main switchboard and downstream distribution boards manufactured in Invercargill, with CWS workshop labour contributed to this local community project.

Explore the hospital project

See more CWS case studies, including an industrial process MCC, a cold-storage main switchboard and dairy ACB retrofit work. Explore our Southland capability or send us the location and requirements of your project elsewhere in New Zealand. For large projects, see our large switchboard capability.

Built on manufacturing

Close to the detail.
Connected to the build.

A switchboard brings a lot of decisions into one piece of equipment. The supply, loads, controls, enclosure and cable access all need to work together. At CWS, the people developing the drawings work alongside the team building the assembly.

That connection carries through the workshop. Equipment layout, wiring, coating, labels and final records are considered as parts of the same job. Consultants, contractors and plant owners can discuss the practical requirements directly with the team responsible for the manufacturing scope.

We build main switchboards, motor control centres, distribution boards, mechanical services boards, control panels and prefabricated switchroom packages. Each starts with the application and an agreed specification.

What comes together here

From the brief to the finished board.

DESIGN

Resolve the requirements.

Supply information, load schedules, protection, control interfaces and the installation space shape the design. Review the proposed arrangement and drawings before manufacture.

Design and drafting
MANUFACTURE

Build the complete assembly.

Assembly and wiring are supported by in-house finishing and identification. Simotrol, Logstrup and Schneider Prisma provide platform options for the specified duty.

Explore our switchboards
TEST & SUPPORT

Prepare for the next stage.

Agree factory checks, functional testing and handover records early. Coordinate delivery and installation responsibilities, with maintenance and retrofit support available for existing assets.

Maintenance and upgrades
A CWS team member assembling switchboard equipment in Invercargill
More under one roof

The finish matters.
So does the identification.

Our powder coating and engraving departments support CWS switchboard manufacture and take on their own trade, industrial and individual customer work.

Bring metalwork preparation, colour and masking requirements into the conversation with our coating team. For equipment labels, control legends and nameplates, our engraving team works from your approved wording, artwork and schedule.

Interested in working with us? See careers and expressions of interest for opportunities in the Invercargill workshop.

Quality and prequalification

Company credentials

These company credentials support project prequalification. Ask us for the current certificates and supporting documents required for your tender or contractor onboarding.

  • ISO 9001Quality management certification
  • Master ElectriciansIndustry membership
  • SiteWise Green2026/27 prequalification
  • AvettaContractor registration
  • TōtikaContractor prequalification

Talk to the workshop

Tell us what you need to build and where it will be installed.

IP Geolocation by DB-IP · CC BY 4.0