Frimley &
Eastbourne.
Main switchboards, motor control centres and control panels for Hastings District Council’s drinking-water infrastructure. Manufactured by CWS and supplied to ICE Electrical.

- Supplied to
- ICE Electrical
- Asset owner
- Hastings District Council
- Sites
- Frimley & Eastbourne
- CWS role
- Manufacture, wiring & FAT
Two sites.
Power and control together.
Two drinking-water sites required more than a single board type. The CWS package covered incoming distribution, motor feeders, pump controls and PLC panels, with manufacture and wiring brought together in our Invercargill workshop.
For a contractor planning a comparable package, this is a useful example of the different assemblies CWS can supply within one manufacturing scope.
The equipment behind the project.
Main switchboards
Incoming power distribution assemblies manufactured to the project requirements.
Motor control centres
Motor feeder and control assemblies for the water infrastructure.
Distribution & pump panels
Distribution boards and pump/control panels within the CWS supply scope.
PLC & control panels
Allen-Bradley / Rockwell PLC panels, internal wiring and I/O terminations.


A clear scope
from panel to site.
CWS carried out the panel manufacture, wiring, I/O termination and FAT within its supply scope.
The project’s control-system integrators carried out software programming and site commissioning.
Explore automation & control panelsPlanning a similar project?
Power and control
for your next project.
Planning a water or wastewater project? Send the board list, motor schedule, control interfaces and required delivery dates. Identify who will provide software and site commissioning so we can define the panel supply scope.
Discuss a water projectOr call +64 3 214 4264