Skip to content
Drinking water / Hastings

Frimley &
Eastbourne.

Main switchboards, motor control centres and control panels for Hastings District Council’s drinking-water infrastructure. Manufactured by CWS and supplied to ICE Electrical.

Switchboards supplied for the Frimley and Eastbourne drinking-water project
Supplied to
ICE Electrical
Asset owner
Hastings District Council
Sites
Frimley & Eastbourne
CWS role
Manufacture, wiring & FAT
One manufacturing package

Two sites.
Power and control together.

Two drinking-water sites required more than a single board type. The CWS package covered incoming distribution, motor feeders, pump controls and PLC panels, with manufacture and wiring brought together in our Invercargill workshop.

For a contractor planning a comparable package, this is a useful example of the different assemblies CWS can supply within one manufacturing scope.

CWS supply scope

The equipment behind the project.

Main switchboards

Incoming power distribution assemblies manufactured to the project requirements.

Motor control centres

Motor feeder and control assemblies for the water infrastructure.

Distribution & pump panels

Distribution boards and pump/control panels within the CWS supply scope.

PLC & control panels

Allen-Bradley / Rockwell PLC panels, internal wiring and I/O terminations.

Control-system interfaces

A clear scope
from panel to site.

CWS carried out the panel manufacture, wiring, I/O termination and FAT within its supply scope.

The project’s control-system integrators carried out software programming and site commissioning.

Explore automation & control panels
Your next project

Power and control
for your next project.

Planning a water or wastewater project? Send the board list, motor schedule, control interfaces and required delivery dates. Identify who will provide software and site commissioning so we can define the panel supply scope.

Discuss a water projectOr call +64 3 214 4264