AS/NZS 61439 and the November NZ transition
Referenced editions and verification information to agree before manufacture.
Company profiles, system documentation and practical planning tools for your next switchboard project.

Use the printable CWS quote checklist to prepare your project brief, then send it with your drawings and equipment schedules.
Printable quote checklist (PDF)Email the completed checklist and drawings to estimating@clivewilson.co.nz.
Choose a document or tool below. For project-specific ratings, verification and documentation, talk to our team about the proposed assembly.
Referenced editions and verification information to agree before manufacture.
2026 edition · Optimised for reading
2026 edition, V2 · Optimised for reading
Certificate 03-44-004-01 · 2 pages
PDF · 87.8 kBCertificate 02-44-004-01 · 2 pages
PDF · 231.7 kB2024 report · cover-page extract · 3 pages
PDF · 214.4 kB2024 report · cover-page extract · 3 pages
PDF · 226.0 kB2024 report · cover-page extract · 3 pages
PDF · 231.4 kB2024 report · cover-page extract · 3 pages
PDF · 249.0 kB2024 report · cover-page extract · 3 pages
PDF · 131.9 kBRev C · 31 July 2024 · 2 pages
CWS-MNT-01 · Revision 1 · 1 October 2026 · 3 pages
General planning worksheet. Site-specific work requires an approved scope and safe method.
Manufacturer maintenance guideDOCA0305EN-01 · March 2026 · Schneider Electric
Open the manufacturer document page and confirm the guide matches the installed control unit.
Manufacturer maintenance guideDOCA0099EN-05 · September 2024 · Schneider Electric
Separate document family for MicroLogic X. Confirm the applicable issue for the installed device.
PDF · 904.5 kBRevision not stated; confirm current issue with CWS · 4 pages
Use these guides to work through common switchboard decisions, then move into the relevant CWS service page when you are ready to price or specify the work.
Fault rating, form of separation, IP rating, metering, documentation and other inputs that make a switchboard quotation comparable.
MSB guideUnderstand the role of the MSB, then review our main switchboard manufacturing capability for a live project.
MCC guideLearn how MCCs differ from ordinary distribution, then review CWS motor control centres, starter arrangements and drive integration.
Selection guideA practical comparison for consultants and contractors working out where power distribution ends and process motor control begins.
Design guideHow internal separation affects access, maintainability and the final switchboard arrangement.
Existing assetsWork through condition, ratings, documentation and shutdown constraints before deciding between remedial work, retrofit and replacement.
Maintenance guidePlan routine inspection and maintenance, then talk to CWS about condition assessment, remedial work or a site maintenance programme.
Project planningThe information and approval steps that influence programme, from quotation through drawings, manufacture and FAT.
Send your specification, site requirements and target dates to our Invercargill team.
Discuss your projectOr call +64 3 214 4264