CWS / New Zealand manufacturing

Healthcare switchboards and distribution.

Main switchboards and downstream distribution manufactured around the approved electrical design. CWS brings the board package, circuit identification and factory records together for healthcare building projects.

Southern Charity Hospital and CWS switchboard photographs
The project brief

Define the supply scheme before the board layout.

Healthcare projects need a clear electrical specification covering the distribution arrangement, circuit responsibilities and operating requirements. Identify normal and alternative supplies, essential loads, changeover arrangements and the board schedule with the project’s electrical designer. These requirements determine the manufacturing scope.

CWS manufactures main switchboards, lighting and power distribution boards and mechanical services switchboards. Internal separation, enclosure access, protection and metering are selected for the agreed project. The presence of a particular form of separation does not establish the performance of the complete healthcare installation.

Agree labelling, room references and circuit naming early. A coordinated schedule helps installers connect the correct circuits and supports the documents handed to the facility team. Specify witness testing, functional checks and the drawing revisions required before dispatch. Site acceptance and commissioning responsibilities remain part of the wider project scope.

Published CWS work

Southern Charity Hospital, Invercargill

CWS manufactured a Form 4 main switchboard and downstream distribution boards for Southern Charity Hospital in Invercargill. The package was assembled and factory tested locally, with drawings, identification and handover documentation. CWS also contributed workshop labour to the community project.

Read the full case study

Your enquiry

Send the information that shapes the board.

  • Approved supply scheme and normal, alternative and essential-load requirements.
  • Board and circuit schedules, protection requirements and metering interfaces.
  • Specified internal separation, installation clearances, cable entry and access.
  • Labelling conventions, witness-test requirements, handover documents and delivery stages.

If some details are still being developed, identify them in your enquiry. Our design and manufacturing team can discuss the outstanding inputs and the scope needed for a quotation. Use the switchboard FAQs for general quoting, testing and delivery questions.

Common questions

Planning your package.

Does the hospital project demonstrate CWS healthcare experience?

Yes. The published Southern Charity Hospital case study identifies the main switchboard, downstream distribution boards and CWS’ manufacturing contribution. It does not imply responsibility for the full building electrical design or installation.

Can you coordinate MSBs and downstream boards in one package?

Yes. Provide the complete board schedule, supply scheme and circuit identification requirements so the scope, drawings, testing and delivery stages can be coordinated.

Bring us your project brief.

Send drawings, schedules, site location and the required programme to estimating@clivewilson.co.nz.

Request a switchboard quote
Planning guides

Define supply and distribution responsibilities.

Use the switchboard specification guide to record the supply arrangement, circuit schedule, installation constraints and required evidence. Our main switchboard and distribution board guide explains the different roles, while the factory acceptance testing guide helps prepare review and witness requirements.

IP Geolocation by DB-IP · CC BY 4.0